Nomax Inc.
Green Park, Missouri

  • ±750 SF Renovation within Existing Facility
  • Renovation of existing storage area to low-humidity dry room (RH = 10% ±5%, Temp = ≤ 60°F).
  • Installed new drywall walls and ceiling within dry room.
  • Zero-Perm vapor barrier membrane utilized in both wall and ceiling systems to form complete vapor seal.
  • Installed smooth-faced FRP to 4’-AFF around dry room perimeter for wash-down.
  • Installed epoxy floor with covered base to match existing facility finishes.
  • Installed vapor resistant strip light fixtures and ceiling-mounted power drops.
  • Installed HCD-2250 Munters Dehumidificaton system with desiccant wheel to serve dry room.

 

Kiddie Academy
Chesterfield , Missouri

UNDER CONSTRUCTION

  • 12,000 SF Child Care Facility
  • 9,000 SF Play Area
  • Wood Structure
  • Brick and EIFS Façade with White Storefront Doors/Window
  • Asphalt Shingle Roof
  • Porous Asphalt Parking Stalls

Brighthouse Networks
Maitland , Florida

  • 43,500 SF Office Renovation
  • Three-Story Office Renovation
  • Accommodates Call Center, Offices, and Production Room
  • Interior Open Office Spaces and Perimeter Closed Door Offices
  • Three-Story Lobby with TV Tree and Lighting on Space Frames
  • 900 SF Patio Overlooking Lake
  • Multiple Conference Rooms and Break Rooms
  • Executive Conference Room with Galley Kitchen
  • Training Room with Operable Partition
  • High Density File Storage Area
  • Remodeled Restrooms with Upgraded Fixtures
  • Replaced the Chilled Water Pipe Loop

Bright House Parking Garage
St. Petersburg, Florida

  • 223,140 SF Four-Level Parking Garage
  • 689 Stalls
  • Concrete Tilt-Up Wall Panels
  • Site-Cast Spandrel Panels
  • Composite Deck and Castellated Beams
  • Designed for Future Addition of 5th Level
  • Adjacent to 165,000 SF Office Building

Audemars Piguet Service Center
Clearwater, Florida

  • 27, 864 SF Office Building Renovations
  • Design / Build Customer Service Operations Center
  • Accommodates Watch Makers, Training, Shipping, Vaults,
  • Offices and Conference Rooms
  • Removed All Interior and Exterior Components Down to
  • the Existing Concrete Structure
  • Repaired Existing Post-Tension Concrete Structure and
  • Strengthened with Steel Beams and Carbon Fiber Wraps
  • Upgraded Building Shell Components with New Insulated
  • Exterior Walls, Storefront Windows, Modified Bitumen
  • Roofing, and Exterior Stucco
  • Modern Industrial Look Featuring Exposed Concrete and
  • Steel Components, Exposed MEP Components, and Bold
  • Accent Colors
  • New MEP Systems, Including LED Lighting
  • Clean Environment with Vacuum and Compressed Air for
  • Watch Makers
  • Removed Three Residential Homes and Reworked the
  • Parking Area to be More Efficient

ARCO Headquarters
St. Louis , Missouri

27,000 SF Two Story Build-to-Suit Office Building

Brick Veneer on Perimeter Stud Framing

Precast Concrete Lintels, Panels and Copings

Perimeter Closed Door Offices and Interior Open Office Space

Two Open Stairs to Promote Continuity Between the Floors

Six Conference Rooms Equipped With State-of-the-Art AV Equipment

1,140 SF Break Room Equipped with AV Including Two (2) Flat Panel Displays

1,000 SF Patio of of Break Room Equipped with Exterior Zoned Audio

Energy Efficient VAV, HVAC & Direct Digital Building

Management Control Systems

1200 Amp Primary Power Service with Mobile Generator

Quick Connect Backup Capability

Energy Efficient Interior Direct/Indirect Florescent Lighting

with Occupancy Sensor Control

Car Parking for 114 Vehicles

AMI Entertainment
Oak Brook Terrace , Illinois

  • 3,500 Total SF
  • Modern Executive Office Improvements
  • Custom Millwork
  • Finish Upgrades Throughout

Ultimaster
Kansas City , Missouri

  • 50,000 Square Foot Outing Warehouse for Ford Transit Vehicles
  • 4,700 Office with Showroom
  • 60 mil TPO Roof
  • 4 – 45,000 lb Air Bag Dock Levelers with Dock Locks and Full Communication Package
  • 8 ½ inch Insulated Pre-Cast Wall Construction

Unilever | Stockton
Stockton, California

  • 600,000 SF Distribution Facility
  • 445,756 SF S-1 Storage
  • 49,248 SF H-3 Storage
  • 5,000 SF Finished Office
  • Two Hundred and Fourteen (214) Trailer Storage Spaces
  • 30’ Clear Height Warehouse
  • Fifty (50) Dock Doors with Automatic Levelers & Truck
  • Restraints
  • Concrete Tilt Wall Construction